Information is beginning to trickle in concerning the BNSF bridge closures.  The attached documents show the times the USCG is allowing the bridge to be closed for work during July and August.  This does NOT mean the bridge will always be closed during the specified times.  Times are listed in 24 hour format and there is also an allowance for +/- 30 minutes.  This does NOT account for closures due to normal operations for train traffic The attachments also show where they are allowed to position equipment during both the open and closed positions.

Full Screen Full Screen